The
specification wooden laminated bar products for a frame construction
fachwerk - Ursa Minor
|
|
|
|
|
|
|
|
|
|
|
|
position
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Total |
|
quantity
4
5
3
4
1
4
2
2
4
2
4
8
5
4
2
2
12
12
80pcs |
|
|
|
|
|
|
|
|
|
|
|
note
Bottom
necking axes A,B,C,D
Bottom necking axes 1,2,3,4,5
Post of an axes 1,4: 1A, 1D, 4B
Post of an axes 1,4: 1B, 1C, 4A, 4D
Post of an axes 4: 4C
Post of an axes 2,3: 2A, 2D, 3A, 3D
Post of an axes 5: 5A, 5D
Post of an axes 5: 5A, 5D
Post of an axes 2,3: 2B, 2C, 3B, 3C
Center post 2nd floor
Purlin NW
Dormant SE
Purlin of Rafters
Purlin NW center
Rafter
Rafter
Rafter
Rafter |
|
|
|
|
|
|
|
Fachwerk
Price: € 28 000.00 |
the
present specification is not a public offer |
 |
|
|
|
|
|
|
|
|
|
|
|
Details
fachwerk made of glued , planed , sanded , ready -to-assemble
timber (softwood lumber). Processing protective structure (using paint -
paint roller ) for transportation and installation of the brand REMMERS
produced by reservation, the price of services 6.00 €/m2 . Details
are performed by German technology on German equipment brand "SCHMIDLER".
Production capacity can produce up to 300 m3 of finished parts of half-timbered
houses in the month.
In the manufacture of laminated veneer lumber
is used glue marks P. I. Bond PI- 111 (Oshika Corp., Tokyo,
Japan) - a two-component structural emulsion polymer - isocyanate adhesive
for wood industry ( structural EPI- glue) .
P. I. Bond PI- 111 with hardener tested by JAS (Japanese Agricultural Standard)
and approved by MAFF (the Japanese Ministry of Agriculture and Fisheries)
as the adhesive system for load-bearing beams of softwood timber. That
complies with the adhesive system of the type I, the European standard
EN 301/302 .
Why glulam
- Save to finish.
- Glued - no twists , the end result is more predictable .
The system of the assembly of the frame components
fachwerk. Most of the nodal connections framework fachwerk
going to the castle , and the connection by tightening bolts with 20mm
cap nut .
Glazing of half-timbered houses.
When ossteklenii half-timbered cottage used frameless glazing and glazing
in the frame with farnituroy . UPVC formula:
1. formula 8 14 6.1.6 LowE laminated glass for all packets
2 . Formula 6-24-6 argon sputtering i, for all packets for all glass .
Filling openings half-timbered cottage.
Gaps can be filled with plate heat insulation , ecowool , glued profiled
beam.
|
|
|
|
|
|
|
|
|
|
|
|
2.
The service installation construction of laminated veneer lumber fachwerk
URSA MINOR and you have a plot in your basement |
|
|
|
|
|
|
|
|
|
|
|
in
the bid price for installation include:
1. Work
installation team
2. Fixing material for building construction
3. The crane for lifting the frame members

|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Price
of installation: €11 200.00 |
|
|
|
|
|
|
|
|
|
|
|
3.
Services for the construction of the thermal circuit at home |
|
|
|
|
|
|
|
|
|
|
|
The
price includes
1. Elaboration
of design documentation
floor plans , elevations
required incisions structural elements
foundation plan
calculation of static loads
2 . Development
of design documentation of engineering systems
radiant floor heating system ( boiler without a project , individual
heating , domestic hot water )
sewerage project ( in-house sewage system until the release of the home)
water supply project ( in-house network of water after the water meter
assembly ) project in-house power supply and lighting (after accounting
unit )
3 . foundation
monolithic
4 . The
wooden half-timbered construction of laminated veneer lumber cottage with
installation
painting of structures framing in 3 layers
5 . Electra
wiring within the home network
wiring from the main switchboard , 1 socket on the premises 5m2
6. Exterior
walls (possibly filling proemof fachwerk and other materials - laminated
corrugated board , foam , etc.
osb plate 12 mm
steam, 1 mm
Rockwool slab insulation 100 mm
DSP sheet 24 mm
facade insulation Rockwool 50 mm
penopilistirol 20 mm
reinforcing mesh of 1 mm
plaster core 1.5 mm
plaster finishing 1.5 mm
bump rainwater
7. The
interior walls
12.5 mm plasterboard
osb plate 12 mm
steam, 1 mm
plate heat insulation 50 50 mm
osb plate 12 mm
12.5 mm plasterboard
8. roof
rafter board 50 * 200 mm (with spans of more than 4000 mm are
glued rafters)plate heat insulation Rocwool 200mm
gypsum board sheathing to 12 mm
vetrogidroizolyatsiya 1mm
steam, 1 mm
bar 50 * 50 crates
BRASS tile cement sand
9. The
floors on 1st floor
Heated floor
10 . Interfloor
overlap
on bearing joists ( joists paired inner lining can be either
open or closed )
11. Floors
2 nd floor
Heated floor
12. glazing
8 -14- triplex 6.1.6 LowE ( ong possible variants of the formula
glazing openings fachwerk )
13. doors
first floor
The front door
interior
second floor
interior
on the balcony
14. Water
supply wiring within the home
15. Waste
water to suction well



|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Price: 1m2/€ 600.00 |
|
|
|
|
|
|
|
|
|
|
|
Wall frame fachwerk. |
|
|
|
|
|
|
|
|
|
|
|
 |
|
1-12.5 mm plasterboard 2-crate opening 3-12mm OSB 4-slab heat insulation 5-rack fachwerk 6-DSP list 7-reinforcing mesh 8-plaster base layer 9-plaster finishing coat 10-rack fachwerk Corner |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
One
of the variants of the roof frame house type fachwerk. |
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Half-timbered
houses - Ursa Minor. Price fachwerk.
The
composition of the offer price frame (Frameworks) for the project at home
Ursa Minor is a skeleton frame products for home (Frameworks), which includes
elements of the frame - racks, beams, trim, floors, rafters, instructions
(advisory) to assemble the frame, packing of glued wood products. The total
volume of wood laminated products - elements of the frame 26 cubic meters.
Whatever
was said, to date, it is safe to say that the half-timbered houses
are gaining in popularity. This is despite the fact that its design and
construction is not very cheap. Given the fact that the real construction
technology fachwerk almost never kept, the cost of a frame house will be
from 800 up to $ 1,600 per square meter.
To
date, most
fachwerk
divided into two subspecies:
Decorative
finishes in style fachwerk. This effect is achieved by attaching strips
of wood prepared and plastered walls. Admission is simple enough, but,
nevertheless, the result is pretty impressive. Of course, the cost
of a frame house trimmed in such a way as to be lower than the
true fachwerk.
"Glass'
house fachwerk. In this case, the space between the beams
are filled with glass. This style is very similar to fachwerk and looks
quite avant-garde. Also, get a house well lit and insulated. The result
is that fachwerk in the modern version looks like a building in the style
of "modern".
The
most common material for the construction of this building is by far the
glue bar from pine wood. These beams provide good stability of the building.
The space between the beams can be as opaque, and glass. Moreover, the
lack of frames makes it possible to place the box anywhere in the building.
One
of the main advantages of half-timbered construction -
is its lightness. The load on the foundation of the minimum is obtained.
This means that the very foundation does not have to be deep. Therefore,
these houses can be build on those areas where the hydrogeology is complex. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
URSA
MINOR |
Facade AA-BB
Facade CC-DD
Plan 1st floor
Plan 2nd floor
General Plan
Price structure
3D vision
Download offer |
|
PROJECT
DETAILS |
length
of 12.4 m
width of 8.9 m
ridge height 7.1 m
heated area of 160 m2
construction area of 238 m2
Balconies area of 18 m2
1st floor ceiling height of 2.6 m
second-floor ceiling height 3.7 m |
|
PRICES |
Thermal
circuit - 93 500 eur.
by m2 heated area - 600 eur/m2
construction area - 390 eur/m2
the price includes materials and work:
project, foundation, frame-mounted, roof, exterior walls, interior walls,
floors first floor, the floors of the second floor, suspended ceiling,
glass, doors, engineering, wiring inside the home.
|
|