Logo_atlanteshouse_eng

TIMBER FRAME HOUSE, CABIN

Fachwerk House, Modern Cabin, Wood House, Chalet Haus

 

rus
eng
 

Posting electricity in the cottage

Frame house is the spatial structure, and how best to conduct an electrician in a house like everyone decides for himself for himself individually.
Construction water is collected and trimmed out, proceeded to rough sex.

Communication in the frame houses are held in the wall timber frame house. In this case, it is drilled and reinforcing metal plates. Laying of concealed wiring in the cavities of easily flammable materials is allowed only metal boxes, metal boxes are laid inside the frame for the wiring. Boxes should have a localized power. This property is the ability not to fire, to withstand a short circuit in the cable, without the fire box material.

It is convenient to use copper pipe for the cable. Copper tube (box) can be easily bent by bending.

For the convenience of finishing all the wires in the wiring frame houses must be solid and hidden in a box.

Electrical wires may be hiding in the finishing works under the baseboard. If necessary, it is easy to get to them.

Upon completion of installation work is carried out complex audits - electro.
1. should be provided with access to replace the cable.
2. uchitavatsya fire safety
3. with open wiring clearance to easily flammable material 10 mm.

On what type of wiring you have chosen will depend on the approach to the organization of work on the wiring in the frame houses.

When selecting in favor of open wiring lost aesthetics but easy to work with the wiring. The type of wiring in the boxes prokladyvaetsya of plastic on top of the wall finish. Material boxes should not be flammable. The same section of the channel should be large enough to heat the cable, which can lead to short circuit.

Wiring in frame houses, and not only have to perform professional, it depends on your safety.

 

 

fachwerk_home
contacts
price
partners
gallery
Glued_laminated_timber
solid_bar
sceleton_by_LVL_bar
design_inside

MARKET
NEWS
     
22.01.2012

WOOD

PROCESSING

DRY

WEST

EAST

 
 
       
 
   
services

design of construction

production

design interea

assembly design

illumination cottage

tuning cottage

sale of land

 

material

laminated bar

LVL bar

solid bar

 

projects

vega

ursa minor

ursa major

saturn

mars

venus

jupiter

neptune

 

projects

pluto

orionis

altair

moon

new dacha

122

143

144

projects

76

antares

pollux

 

tips

sewage

plumbing

heating

electrician

landscaping

lot preparation

glazing fachwerk

fachwerk wall

 

 
 
2003-2012, Copyright AtlantesHouse
Russia, Saint-Petersburg
Web design, web design - SEO studio 59
Advertising, website promotion