The specification wooden laminated bar products for a frame construction fachwerk - 143

   

position

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

 

 

quantity

2
2
2
2
2
2
2
2
2
2
4
2
6
4
2
4
4
4
24

Total 74

 

 

 

 

 

name

Beams 1st floor NW
Lower. rail axis A, D
Lower. rail axis 1.4
Racks axis 1 - 1A, 1D
Racks axis 1 - 1B, 1C
Racks axis 2 - 2A, 2D
Racks axis 2 - 2B, 2C
Rack axis 3 - 3A, 3D
Rack axis 3 - 3B, 3C
Racks axis 4 - 4A, 4D
Racks axis 4 - 4B, 4C
racks central
2nd floor beams NW
Runs windows SE
Runs windows SE
truss girders
Runs NW Center
Stropla window
rafters

 
              Fachwerk Price: € 21300.00  
the present specification is not a public offer  
                           

fachwerk_coast

Details fachwerk made of glued , planed , sanded , ready -to-assemble timber (softwood lumber). Processing protective structure (using paint - paint roller ) for transportation and installation of the brand REMMERS produced by reservation, the price of services 6.00 €/m2 . Details are performed by German technology on German equipment brand "SCHMIDLER". Production capacity can produce up to 300 m3 of finished parts of half-timbered houses in the month.

In the manufacture of laminated veneer lumber is used glue marks P. I. Bond PI- 111 (Oshika Corp., Tokyo, Japan) - a two-component structural emulsion polymer - isocyanate adhesive for wood industry ( structural EPI- glue) .
P. I. Bond PI- 111 with hardener tested by JAS (Japanese Agricultural Standard) and approved by MAFF (the Japanese Ministry of Agriculture and Fisheries) as the adhesive system for load-bearing beams of softwood timber. That complies with the adhesive system of the type I, the European standard EN 301/302 .

Why glulam
- Save to finish.
- Glued - no twists , the end result is more predictable .

The system of the assembly of the frame components fachwerk. Most of the nodal connections framework fachwerk going to the castle , and the connection by tightening bolts with 20mm cap nut .

Glazing of half-timbered houses. When ossteklenii half-timbered cottage used frameless glazing and glazing in the frame with farnituroy . UPVC formula:
1. formula 8 14 6.1.6 LowE laminated glass for all packets
2 . Formula 6-24-6 argon sputtering i, for all packets for all glass .

Filling openings half-timbered cottage. Gaps can be filled with plate heat insulation , ecowool , glued profiled beam.

 
                           
2. The service installation construction of laminated veneer lumber fachwerk 143 and you have a plot in your basement
 

in the bid price for installation include:

1. Work installation team
2. Fixing material for building construction
3. The crane for lifting the frame members

fachwerk_assembling

             
     
Price of installation: € 9 500.00
             
3. Services for the construction of the thermal circuit at home
The price includes

1. Elaboration of design documentation
floor plans , elevations
required incisions structural elements
foundation plan
calculation of static loads

2 . Development of design documentation of engineering systems
radiant floor heating system ( boiler without a project , individual heating , domestic hot water )
sewerage project ( in-house sewage system until the release of the home)
water supply project ( in-house network of water after the water meter assembly ) project in-house power supply and lighting (after accounting unit )

3 . foundation
monolithic

4 . The wooden half-timbered construction of laminated veneer lumber cottage with installation
painting of structures framing in 3 layers

5 . Electra wiring within the home network
wiring from the main switchboard , 1 socket on the premises 5m2

6. Exterior walls (possibly filling proemof fachwerk and other materials - laminated corrugated board , foam , etc.
osb plate 12 mm
steam, 1 mm
Rockwool slab insulation 100 mm
DSP sheet 24 mm
facade insulation Rockwool 50 mm
penopilistirol 20 mm
reinforcing mesh of 1 mm
plaster core 1.5 mm
plaster finishing 1.5 mm
bump rainwater

7. The interior walls
12.5 mm plasterboard
osb plate 12 mm
steam, 1 mm
plate heat insulation 50 50 mm
osb plate 12 mm
12.5 mm plasterboard

8. roof
rafter board 50 * 200 mm (with spans of more than 4000 mm are glued rafters)plate heat insulation Rocwool 200mm
gypsum board sheathing to 12 mm
vetrogidroizolyatsiya 1mm
steam, 1 mm
bar 50 * 50 crates
BRASS tile cement sand

9. The floors on 1st floor
Heated floor

10 . Interfloor overlap
on bearing joists ( joists paired inner lining can be either open or closed )

11. Floors 2 nd floor
Heated floor

12. glazing
8 -14- triplex 6.1.6 LowE ( ong possible variants of the formula glazing openings fachwerk )

13. doors
first floor
The front door
interior

second floor
interior
on the balcony

14. Water supply wiring within the home

15. Waste water to suction well

Timber_Frame_House_143_AABB

           
    Price: 1m2/€ 600.00
           
Wall frame fachwerk.
fachwerk_wall-  
1-12.5 mm plasterboard
2-crate opening
3-12mm OSB
4-slab heat insulation
5-rack fachwerk
6-DSP list
7-reinforcing mesh
8-plaster base layer
9-plaster finishing coat
10-rack fachwerk Corner
   

One of the variants of the roof frame house type fachwerk.

   
wachwerk_roof  
   
 

Fachwerk 143. Price.

The cost of a frame house fully paid off the quality and convenience of the further operation of the building. The main bearing elements of the frame are made of carefully processed and dried wood. That is the choice of timber depends on how long an building. Leading manufacturers of glued bar used in the production of modern precision technology. All elements of the frame is processed with natural oils, preservatives and flame retardants that can not only extend the life of the wood, but also protect it from fire and the ravages of insects and bacteria.

One of the key elements that distinguish fachwerk from other skeletal structures, a method of attaching beams to each other, almost without using metal fasteners.

The use of modern insulating materials help to ensure that the building will withstand severe frosts in winter. As the insulation is most commonly used mineral wool made of quartz or basalt fiber. However, if a customer wants to reduce the cost of a frame house, then use other heaters.

Much attention is paid to building a house fachwerk terms. They are several times smaller than the time to build any other buildings. For example, making the frame at the plant takes about 2 weeks. Installation of the frame at the construction site will occupy no more than ten days. All further decoration, insulation and other works - a couple of months.

The cost of a frame house starts from 600 EUR per square meter and above. This amount includes the construction of the foundation, design and installation of a wooden frame, the installation of a roof with a vapor barrier, installation of floor and ceiling, installation of windows, the organization of the sewerage system, insulation and other works.

 
     
FACHWERK 143
Facade AA-BB
Facade CC-DD
Plan 1st floor
Plan 2nd floor
General Plane
Price structure
3D vision
   
 
PROJECT DETAILS
length of 8.9 m
width of 9.3 m
ridge height 7.3 m
heated area of 143 m2
construction area of 182.5 m2
Balconies area of 18.4 m2
1st floor ceiling height of 3 m
2nd floor ceiling height 1.7-3.7 m
 
PRICES
Thermal circuit - 85 800 eur
by m2 heated area - 600 eur/m2
construction area - 470 eur/m2
 

the price includes materials and work:
project, foundation, frame-mounted, roof, exterior walls, interior walls, floors first floor, the floors of the second floor, suspended ceiling, glass, doors, engineering, wiring inside the home.

       
     
   
SERVICES  
MATERIAL
  PROJETS   PROJETS   PROJETS   PROJETS   TIPS


design of construction

production

interior Design

assembly design

illumination cottage

tuning cottage

sale of land


CBPB

OSB

thermal insulation

metal for the frame

edging board


vega

ursa minor

ursa major

saturn

mars

venus

jupiter

neptune

scorpii

 


pluto

orionis

altair

moon

new dacha

122

143

144

canopus


76

antares

pollux

eltanin

procyon

arcux

capella

sirius

enif

bellatrix


avior

indi

markab

kaus australis

hadar

centaur

crux

spica

persei

nunki


sewage

plumbing

heating

electrician

landscaping

lot preparation

glazing fachwerk

fachwerk wall

 

                             
2003-2013, Copyright AtlantesHouse
tel.: +7-812-716-05-02
CONTACT
Web design, website creation, promotion, studio SEO47.ru
Advertising, graphic design, photo, video.
SITE MAP